Sunday, March 27, 2011

Why Do Some Pigments Not Separate?

complicates a train crash


Everything seems to indicate that train crash happened in San Miguel for a little over a month, which caused four deaths and 116 wounded, was a tragedy foretold. So estimated Justice which began investigating the alleged role of officials from national and provincial governments.
Recent surveys conducted in the San Martín railroad cars had determined that flats recovered corroded and bumper welding method, indicating that the formation N ° 3443 UGOFE company was not able to protect the impact on passengers, serious deficiencies in its structure.
of the administration headed by Daniel Scioli gobernadorbonaerense Ferrobaires depends on the company, which owns the locomotive left the tracks with the system brakes partially annulled.
While the objections to national government officials are based on the lack of control of the National Commission for Transport Regulation (CNRT) to UGOFE company, led by San Martín railroad, which allowed circulate formations serious flaws in its construction and materials unable to withstand a shock like that caused the tragedy in San Miguel.
The complaint had been filed by the deputy national DC in federal court in San Martin and began to be discussed by Judge Juan Manuel Yalj.
In reviewing Ferrobaires locomotive, experts determined that the drivers were unable to stop the training before an emergency, as was the fact find a convoy stopped on the tracks, because the brake system had been partially annulled.
This is in addition to the San Martín railroad cars had the bumper ground running and recovered by the method of electric welding. This means that the system had to absorb the impact violence of any training received was not prepared for a shock like that happened in San Miguel.
Feb. 16, four passengers in the convoy were killed and 116 wounded when a Ferrobaires Locomotive Company, who came out of retirement due to Junin, hit railroad training San Martín.
Machine No. 9076 boarded the last car of the formation of the UGOFE that according to expert assessments, failed to absorb the violence because it had serious deficiencies in the bumper and the floor had corroded, causing the displacement body toward the two cars following, identified as U3624 and U3539, which traveled the four people killed and most of the 116 injured passengers.
"It seems that the causes of car setup U3624 on U3539 car would have been due to the shell, for cracks and / or deficiencies in material, gave way causing the center pin frame of the bogie, it appears literally the same, leaving the body free to move away, allowing paid within the U3539 ", the report submitted by the expert before the federal judge Yalj.
" In other words, if the shell had not given freeing the central pivot of frame of the bogie, both cars had not been assembled, receiving and force of impact absorbing bumpers. However, it should be noted that the bumpers were not apparently in good condition having been recovered by the method electric welding, "added the experts who signed the technical study, incorporated in the record between 106 and 135 folios.
The complaint that Congressman Moran appeared before the federal judge Yalj, the lawmaker accused the minister of provincial infrastructure, Cristina Alvarez Rodriguez, the Transportation Secretary's Office, Juan Pablo Schiavi, the former head of that department Ricardo Jaime, and Eduardo Gnarini, who served as administrator of Ferrobaires at the time the tragedy occurred.
As stated in the introduction, the legislature requested an investigation into the responsibility of the accused by alleged violation of the commission and public official duties.


"Both the national and provincial government are primarily responsible for the lack of infrastructure maintenance and rail service and lack of control", had expressed the legislature in its complaint.
Test Measures ordered by the Moran played in Yalj arraignment is a series of surveys on the state of the wagons of the train formation of San Martín.
"This will indicate if a clash of these features alone produces such damage or, in fact, were a direct result of the state of the cars and trains, "said Moran.
These surveys and concluded that if the cars had been in good condition, would have absorbed the violence of the impact.
CONCLUSIONS
  • U3624 Car (UGOFE): here some of the victims were traveling. His bumper plates cut the stem height. This should be the recovered welding method. The floor of the car was totally damaged and corroded.
  • Car U3539 (UGOFE): here also traveled several victims. According to surveys, the drawers which house the tubes were cracked bumper. Both dishes of the fenders were cut at the stems.
  • Car FU2570 (UGOFE): is the van that was struck by the locomotive Ferrobaires. The sheet has a thickness of 1.5 mm, when according to the manufacturer's manual should be of 3.175 mm.
  • Locomotive 9076 (Ferrobaires) pedal deadman annulled by nails, tools disconnected odometers and speedometers, emergency brake valve on the side of assistant wired bundle.

Martha Stewart Christmas Swags

The world's hardest train

Like a giant snake this train travels 446 miles from four meters above sea level to reach 3,600, feet.


That is the goal of an ambitious project of the Government of Ecuador to restore a conveyance that was unifying the country and had fallen into oblivion and decay. So far there are about 180 kilometers of roads repaired, including the spectacular "Devil's Nose," where the train must perform tasks in a zigzag to tame a mountain of rock. In the construction of that section killed some 4,000 people by the use of dynamite, landslides, snakebites and various diseases.
The dream of the railway began in 1861 with the start of construction by the government of conservative Gabriel Garcia Moreno, which ended in 1908, the Liberal President Eloy Alfaro. The iron mill was a prop to stimulate the economy, but after more than forty years operations came its decline.
Restores Some new acquisitions here and there were not enough to awaken the giant snake until in 2008 began the process of repairing the track, with an investment of $ 245 million.
A monumental project
seemed crazy over a century the idea of \u200b\u200blinking the coast with the Sierra of Ecuador by a rail and with good reason: huge mountains and rough terrain were not the best introduction for technical or not to the art of the time.
But ultimately, the railroad joined forever the landscape of the country and the train became a hub of national integration, structuring of the identity of Ecuador and an economic engine.
Over time, the construction and improvement of other roads was moving the train and its gradual demise also resulted in the isolation of communities entrenched in mountains and valleys with difficult access.
therefore revive the train is now limited to repairing the tracks, but to involve communities in tourism and trade with the creation of museums, shops, cafes or restaurants that Ecuadorians from the bowels of the mountains offer their products and promote their sites and culture.
Nizac The community, one of the beneficiaries in the province of Chimborazo, not only caters to tourists Sibambe station, it opens the doors of their houses to those who want to learn about their customs and assimilate ancestral knowledge.
Legend of love and hate
With an investment of $ 12 million nine dollars restore functional locomotives will be built new cars and will receive technical assistance. Although the similarity of railway history and technology, as well as language that Ecuador did bend their attention to Spain for the rehabilitation of the railway system, the waters of the Atlantic pushed the project to England. With the help of that country, Ecuador initially expected rehabilitate about five centuries old steam locomotives.
According to estimates of repair, snow-capped scenery and vegetation of Costa and Amazon can be seen from the windows of the train or diesel train when all sections come into operation.
repaired in sections and can be seen dreamy landscapes with green mountains dressed in different designs for different crops. There are also visions of vertigo in some places the path does not give more than the rail option for the passage of the train.
With jagged rocks on one side and steep chasms on the other, visitors can choose to guess about the ups and downs a century ago to open the mountain to pass the train or in the dreamy possibility of extending rail the clouds, since sharp bends seems certain that the locomotive was available to fly.
comfortable Payment rates for transportation not only entitles you to spectacular views as volcanoes, glaciers, communities or herds of native animals, but also to the immersion into the world of the indigenous world, where the elements of nature come alive.
The legend says the tour guide Luisa Martinez, who was the wife Iliniza south of Mount Iliniza north, became enamored of the volcano Cotopaxi and warned Rumiñahui adventure, which shattered the mountain heart, son of Ilinizas, whose painful tears Quilotoa lagoon formed.
Therefore, the Cotopaxi is almost always cloudy, then hides his shame of having damaged a marriage, Martinez said, as part of a spectacular view of all these mountains and hills. Some call it the "sky train" and other "train harder in the world" by going through the complicated geography, which was tamed with a tenacity and sacrifice that Ecuador wants to honor the resurrection of the tracks.

How To Remove Rounded Back Earring Studs

SIDE A man, linked to Pedraza and an attempt to bribe

The link between the arrested general secretary of the Union of Railways (UF), José Pedraza, a lawyer and former judicial official to the alleged payment of bribes to secure the release of the first seven arrested for the crime of militant Workers Party (PO) Mariano Ferreyra was an employee of the Office of the President, Officer of the Ministry of Intelligence (SI), sources said court.

The news was reported in recent days by Judge Wilma Lee the owner of the SI (former SIDE), Hector Icazuriaga. The agent is called Juan Jose Riquelme and appeared in wiretapping ordered by the court by Lopez during the summer on cellular Pedraza then arrested and other suspects.

"For the dialogues seem to have a close connection with Pedraza, "said a source close to the investigation into the mysterious Riquelme. The man was the nexus between the lawyer and Octavio Pedraza Araoz de Lamadrid, a former secretary of the National Chamber of Criminal Appeal. Araoz de Lamadrid defended one of the arrested, Guillermo Uño. And now investigating whether he tried to pay a bribe to secure the release of detainees.

In one of these dialogues, Riquelme said to Pedraza Araoz de Lamadrid that would give "all papers" for him to sign. "My bill?" asked the lawyer. "It is done," said Riquelme, according to sources with access to the cause.

Researchers suspect that the mention of "roles" was actually a reference to dollars allegedly gathered for the alleged bribe. The lawyer seized a package containing $ 50,000 in a raid. Close said it was his fee for a new trial and denied that corresponded to the bribery investigation. Araoz de Lamadrid had worked in the Court of Appeals with a judge who could get involved in the request for release of the first seven arrested in the case, Eduardo Riggi.

January 13, Riquelme lawyer called and said the following, as recorded in the case: "Well, I tell him ... I said (supposedly Pedraza) is very well spent and number you this afternoon, at sunset, have a meeting with the secretary, who last night spoke to him about it, the secretary said that there is no problem with the item, the only concern he has is how frame the operative, which is why they will meet tonight. "

After detecting the first calls to Pedraza and Araoz de Lamadrid, the researchers found that Riquelme tried to contact the headquarters of the SI on 10 January at 19.39. By deepening the research found that Riquelme had given to the Federal Police, to file a document, the name of someone residing in central spies person "reference" or knowledge.

Since the court called the SI to ask if I worked there Riquelme and responded positively, according to judicial sources narrated. Judge Icazuriaga notified of the complaint made by "influence peddling" against Riquelme and others, including himself and Araoz de Lamadrid Pedraza. The case heard independently that of the crime and before another judge Ferreyra, Luis Rodriguez.

argued before Judge Icazuriaga "public nature" of the task performed by Riquelme as an agent of the SI, a subsidiary organization of the Presidency.

Bone Through Gum After Extraction

not enter the Patagones party trains Train

The official explanation has little logic: repair of locomotives.

Patagones. A month ago, the train enters the game Patagones. The discomfort grows if you do not have this tool to enjoy a long weekend, as that is living.
Even worse, now is the second four-day holiday in less than a month, and the rail transport service did not respond to the demand for tourism in the extreme south of Buenos Aires.
This time, the official response to the lack of travel does not convince themselves or strangers, as they say, when training enters Delhi, instead of continuing south, seize the time to make repairs, sending locomotives to workshops with the railway station which has bahiense.
In just over a year the train service bound for Patagones party was seriously affected.
In January 2010 services were suspended as a result of accumulated sand on the tracks: the critical point was located between Villalonga and Stroeder. Only in August of that year, making travel restored Stroeder final season.
Demand
Demand for tickets is high enough to deem it necessary to return travel to the far south of Buenos Aires.
On several occasions, tickets sold out in locations such as Pedro Luro and Stroeder.
Many residents of these villages take advantage of the train for short trips to other places nearby, taking advantage of affordable fares.
This will continue until, from the Delhi station, inform the restoration of travel, a fact which has no fixed date.
Low maintenance
Since the previous suspension of service, there were no major work designed to stop the laying of roads usable between Stroeder and El Carmen, which added to removes the service which shows little interest being paid by the company providing the service.